Run a cement decarbonisation process on the lab twin
Open the journey AEC 5 of 9
| Trigger | A site wants to test a change before trial |
|---|---|
| Outcome | The predicted change links to the lab twin version and its calibration. |
| Sender | Plant engineer |
| Receiver | Lane steward |
| Records and receipts | Simulation record linked to the lab twin; receipt; every receipt carries a tok id |
| Permissions | Plant engineer runs; every actor is bound to an EDGE ID and every agent act carries its ATBAN |
| Regulation | UK ETS; UK CBAM from 1 January 2027 covering cement; Construction Products Regulation; BS EN 15804 for product declarations; Subsidy Control Act 2022 |
| Blueprint | — |
| Benchmarks | BM-NV-TWIN-01, BM-CEMENT-01 |
| tok | tok-d176ff5a96e12eb337ded6111ba8028e |
Steps
| 1 | Select the site twin |
| 2 | Enter the kiln or blend change |
| 3 | Run the simulation |
| 4 | Record predicted emissions change |
| 5 | Record the result receipt |
Cases
| happy path | The predicted change links to the lab twin version and its calibration. |
| receiving side | the lane steward sees the simulation record linked to the lab twin and the same receipt id |
| failure path | twin uncalibrated |
| failure path | out of range |
| failure path | expired EDGE ID session |
| seven widths, both themes | no overflow, no cut text, axe serious or critical = 0 |
| independent re-run | a non-builder agent reproduces the happy path from the reproduce command with the same result |